Having successfully completed the external repairs and maintenance programme at 27–30 Lime Street in April last year, we are pleased to have been invited back to undertake a 10-week CAT A & B refurbishment programme to the fourth floor.
Working within this Grade II Listed building, the refurbishment will carefully balance the requirements of a modern workplace with the character and fabric of the existing property.
Our scope of works includes:
- Internal strip-out, including ceilings, kitchen and mechanical & electrical elements.
- Plastering throughout.
- Installation of bespoke glazed and timber-slatted partitions.
- Installation of a new kitchenette.
- New flooring throughout.
- A/C system ventilation and grilles.
- Installation of acoustic barriers within the floor and ceiling voids.
- New fire alarm system.
- Overhaul of all windows.
- Installation of new metal-framed, plasterboard-lined ceilings.
- Complete internal redecoration throughout.
We’re delighted to be returning to 27–30 Lime Street and look forward to sharing progress as the refurbishment takes shape.
Look out for project updates coming soon.

