https://www.collins-contractors.co.uk/wp-content/uploads/2025/03/Regent-St-News-Video.mp4 Collins are nearing completion with our damp proofing project at Smeg & Snow Peak along Regent St.We have successfully installed a damp proof membrane system alongside a Renstrength RS-3 Pro system which has been applied to the soffit & encased concrete beams. Working with Smeg’s nominated Italian flooring contractors, we are replacing and…
Collins have begun excavating as part of the substrate preparation works to form a new patio area in accordance with the architect’s drawings. This will completely transform the space by adding approx. 200m2 of paved area to enable those within the Almshouses to benefit from an outdoor seating area ready for the summer months. The…
The external repairs and redecorations to all elevations of this charming, red brick period property located in the heart of Chelsea are now complete. Works to this project included: Roof repairs and refurbishment Stone and render cleaning Brickwork and render repairs Window restoration Joinery repairs Miscellaneous cleaning and repairs throughout Complete redecoration of all previously…
Collins successfully handed over the top scaffold lifts today at this residential block in West Byfleet. We have carried out over 1000 isolated tiles replacement, renewal of flaunching and associated repointing to stacks, re-bedding and repointing of the ridge tiles, and introducing new lead stepped flashings and soakers to all stacks. The Contract Administrator was…
The scaffolding has been mostly dismantled at this residential property, ready to undertake the lower level masonry repairs and final decorations. This block has benefited from an extensive restoration and both us and the client are delighted with the transformation. For more information of the works undertaken or a detailed case study on completion, please…
We have now been in our Orpington Office for two years. Since outgrowing our Ladywell Head Office the company has continued to expand. After settling in here, we are still enjoying our newly refurbished premises.
Works are progressing well onsite at Crawley. The strip out works have been completed, our temporary propping design has been approved, and the supporting scaffold with associated steel needles have been installed, ready for the removal of the supporting dividing wall between the units. The steels are in place and ready to be installed in…
The external refurbishment works to this residential property located in the Royal Borough of Kensington and Chelsea is now complete. Works to this project included the following: Doff cleaning to façade brick and stonework Extensive masonry repairs Joinery repairs General roof repairs New guaranteed liquid overcoat system to the main flat roof Glazing repairs…
As our extensive refurbishment works at Jenner Court approaches completion, the Scaffold is now being dismantled. Look out for further photos coming soon of this Grade II Listed building.
On Sunday 9th March some of our team members will be running The Paddock Wood Half Marathon. The Half Marathon is an annual road running event which has been held since 1989. Our team will take on the 13.1 mile run in aid of our chosen charity of the year Ellenor. If you would like to support…
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.