The scaffold is now complete at Holloway Fire Station and works are underway.
Our team worked with the LFB to minimise disruption and enable the station to function as normal, whilst ensuring the structure was erected safely and to the highest possible standards.
The validations of the existing plant at roof level are underway and we are working with the M&E Consultant to report on the condition of the equipment and identify any replacements required.
Roofing works are progressing in line with the Langley specification to all other areas.