Chiltern Court
https://www.collins-contractors.co.uk/wp-content/uploads/2025/06/Chiltern-Court-Crane-News.mp4 Our directors Ben & Jack, along with Project Manager Steve were in attendance overnight for a mobile crane lift to distribute 4no 300kg Portland stone blocks onto the required scaffold lifts ready to be installed. Due to the location of the project; situated above Baker Street Station, and along a very busy double red…