34-37 Sloane Square
Works are progressing well onsite; We are continuing with the installation of ceiling grids in preparation of the new mf ceilings, introducing fire lining to the structural steel columns and beams, installing the new drainage routes in the basement and laying the blockwork walls to divide the units. Look out for more updates shortly.