Our works at Holloway Fire Station are currently making good progress; installation of the new Langley roofing system has been applied, incorporating 180mm flat board insulation to enhance thermal performance and long-term durability.
The Replacement roof lights and the barrel rooflight to the appliance bay are currently being installed.
All works are being carried out beneath a temporary scaffold roof, allowing the Fire Station to remain fully operational throughout the duration of the project.
We look forward to sharing further updates from site soon.